Laserfiche WebLink
U. S. DEPT. OF THE INTEKIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />._ ,~~., State Program <br />ar~, l~~ <br />1. Permittee/Pers <br />~ 9. Permit Number 10. Permit Type i <br /> AL(~FP p <br />SENECA CO ~ <br />~ 2006 C-005-80 PP <br /> ,_ <br />2. Address oration, ] 1. Field Visit Date 12. Purpose ]3. SRA Present <br /> P. O. BOX 670, CRJ~ t ~~ ~~atety . 08!10/2006 OBR ^Y <br />3. City 4. State mm-dd -yyyy <br /> 14. Permit Status 15. Site Status 16. Facility Type <br />HAYDEN CO <br />IN <br />MC <br />5. Zip Code 6. Phone R umber <br />17. OSM Office # <br />18. CCID # 19. Land Code <br />81639- (970)276-52]7 <br />140 <br />~ SF <br />7. Operator Name, if Different than Permittee <br />22 <br />N <br /> 20. M.S.H.A ID # 21. Stat . County <br />ame <br />e Abrev. <br /> 00304 <br />05 CO ROUTT <br />Mi <br />N <br />8 - <br /> ne <br />ame <br />. <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />SENECA #II <br /> 084730 <br />25. Hours 26. Signature Block 27. Reviewing Official: <br />2.0 a. Permit Review ~~ r ~(!/tAt.o1 .~-~ <br />0 b. Site Visit Time <br />24 Stgt "" e. 2'3 O Signature: <br />. HENRY AUSTIN Ill # 116 <br />c. Travel Time <br />9.0 <br />Printed Name: Review Date: ~ /,ya / Z dOG <br />d <br /> <br />~ 2.0 d. Report Writing <br />Date: 08/23/2006 mm - <br />d - yyyy <br />Is Supplemental MSE Page Used Y/N Y~ <br />Permit Type --Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Codes Item 12 <br />pxx.,,,Oversight <br />Axx.... Assishance <br />Joint Inspection-Item 13 A <br />RFx.... Reclamation Fees <br />Fxx..... Federal Actions <br />Is when a state <br />CCR... Gtizen Complaint Referral (non site visit) <br />CC...... Citizen Complaint (initial site visit) <br />CCF.... Citizen Complaint Follow-up <br />an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without Completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />Permitted but not yet disturbed. ABt..BOnd Forteiture: Bond forfeiture officially in process or completed, and. <br />IN.... nactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) gg2.,parfially Reclaimed Forteiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initialed. used to roclaim site, but site not reclaimed to Program standards. <br />BR...gond Release: Reclamation completed and State Regulatory A83..Reclaimed Forfeiture: Forfeited Site that has been reclaimed to Program slantlard~. <br />Authority (RA) has released all of the bond (Phase III Release.) NA.,.Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS..Non-Site Visit: Status of site not determines <br />ND.. No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration; Coal exploration operations TC..Temporary Cessation: The RA has granted pperformance bond(s), andlor reclama- <br />havestarted and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tlon of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />AP.. Activo Coal Producing: Coal surface mining P1...Phase I RRelease: At least Phase I bond release reclamation completed. <br />activities are occurring. granted for entire permitted area. For interim FO..Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2., Phase II Release: At least Phase II bond release WC. Wildcat Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site is for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal p3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activtty, and stte not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Naulroad, Conveyor, andlor Rails) H...Ezploration Permits L... Remining site ppermined <br />A.., Surface E... Refuse and/or Impoundment L.. Notice of Intent to Explore under 30 CFR785.25 <br />8... Underground F... Loading Facility and/o• Tipple J... Exempt 16 and 2/3 <br />C.., Preparation Plant G.., Stockpiles K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federa! agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. If you are a small business (a business with S00 or fewer employees including those of affiliates) page 1 of <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). xeu~ea n=~emx.a, i9ss <br />