My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43784
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43784
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:47:06 PM
Creation date
11/18/2007 11:33:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978268
IBM Index Class Name
Inspection
Doc Date
5/28/1999
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
5/19/1999
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (Page 41 • <br />MINE ID # OR PROSPECTING ID # M-78-268 <br />INSPECTION DATE 5/19/99 <br />INSPECTOR'S INITIALS RCO <br />The following problems IPBI and/or possible violatiorisy~PV) land suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land Reclamation <br />Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />The topsoil stockpiled at the site and some of the respread topsoil is being allowed to 7 3/ 1 /99 <br />degrade due to infestation of noxious weeds (thistles), and some of the stockpiled <br />topsoil is being damaged due to earthmoving equipment. PB or PV: PB <br />TOPICISI: TS <br />CORRECTIVE ACTION: The operator must repair any deteriorating stockpiles if the , _ <br />soil is to remain in the stockpile, either by grading or weed control treatment, <br />depending on the problem. For all weed control issues, an adequate plan must be <br />submitted to this office, which will become part of the permitted mining and <br />reclamation plans. <br />The weed control plan must be prepared and submitted to this office by the date <br />shown at right. Ilt must be implemented as described in the next paragraph.) <br />All treatment to the soil (earthwork and seeding vs. herbicide spray, for example, <br />depending on which problem is affecting the soil) must be performed, and written <br />evidence submitted to this office. Evidence submitted must be received by the date <br />shown at right. <br />2. None. <br />CORRECTIVE ACTION: <br />3. None. <br />CORRECTIVE ACTION: <br />PB or PV: <br />TOPICISI: <br />PB or PV: <br />TOPICISI: , _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.