Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Cazbon Junction Mine conducted by Tom Gillis of CDMG. No one <br />represented the operator during the field portion of the inspection. The mine site had approximately 4 <br />inches of snow cover at the time of the inspection. <br />Roads <br />The routine ditch & culvert maintenance work referenced in the previous inspection still needs to be <br />undertaken in the near future to ensure that the drainage control system continues to function properly. <br />HydroloEic Balance <br />Ponds were inspected and found to be functioning properly. The large pond adjacent to the spoil pile was <br />dry at the time of the inspection. <br />