My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43505
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:53 PM
Creation date
11/18/2007 11:32:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
6/22/2005
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS - COMPLIANCE <br />Below are comments on the inspection. The comments include tliscussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during, the inspection and the facts or evidence <br />supporting the enforcement action. <br />This was a complete inspection conducted by Kent Gorham of the <br />Colorado Division of Minerals and Geology. This former, contour <br />strip operation is bond revoked. Inspection frequency is quarterly, <br />with one complete inspection each year. Ground conditions on this <br />day were dry and the weather was hot. <br />Roads <br />The steep section of the road leading south into Section 22 remains <br />ir. good condition after repair work conducted late in 2004. <br />hydrologic Balance <br />A11 ponds throughout the site <br />were holding moderate amcunts <br />of water. Given the murky <br />appearance of the pond water, <br />storm runoff likely occurred <br />in the last few days fzem <br />prevailing afternoon <br />thundershowers. <br />Fonds 22-P5, show at right, <br />was full to the invert of the <br />small riser pipe. The <br />embankment is part of the <br />two-track road leading back <br />into section 22. <br />through the county road box <br />delta upstream. <br />Pond 22-P6, shcwn at left, was <br />also holding water to the top of <br />"~~ discharge pipe. These ponds, <br />`;en holding water, allow grazing <br />r:~ck to disperse around the site <br />~ ,i utilize remote reclaimed areas <br />.ping the grazing season. <br />The repaired portion of the ditch <br />North and east of reclaimed po.^.d <br />!5-P1 has experienced significant <br />:lows, as evidenced by movement of <br />=ome of the riprap at the last <br />check dam before the flow passes <br />. Each check dam has a sediment <br />
The URL can be used to link to this page
Your browser does not support the video tag.