My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43363
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:47 PM
Creation date
11/18/2007 11:31:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977053
IBM Index Class Name
Inspection
Doc Date
7/22/2006
Doc Name
Oil Problem Correction
From
Asphalt Constructors
To
DMG
Inspection Date
6/14/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />2~~'~~6 <br />J~~ <br />~~`' <br />July 21, 2006 <br />r~~ <br />~~~ <br />G~~ G1 4l; ~9 <br />O ~ "~,/~ <br />i <br />~d,~ <br />•`,~ (~f <br />~9 <br />rC <br />~'~ <br />7040 W. Hwy. 160 P.O. Box 649 Alamosa, Co. 81101 (719) 5895671 <br />Mr. Bob Oswald <br />Division of Minerals and Geology <br />701 Camino Del Rio, Room 125 <br />Durango, CO 81301 <br />RE: SMITH PIT M1977-053 <br />Dear Bob: <br /> <br /> <br />Attached herewith are the photos of the area that did contain the storage of the <br />waste oil barrels. We transported the barrels to Alamosa and deposited the <br />waste oil in our waste oil tank there. Thermofluids comes by regularly and hauls <br />this waste oil away. <br />As discussed we removed the dirty soil from the area and placed it along the <br />access road into the staging area. It will have regular heavy truck traffic across it <br />and the trucks then head up the hill out of the pit. You will note in the pictures <br />that we moved the green storage trailer to another location in the pit and cleaned <br />up the entire area. <br />This work was performed the Saturday following your inspection, 6/17 and the <br />pictures were taken on 6/20/2006. <br />We have implemented another procedure that will require all waste oil from the <br />pit to be transported to the central tank in Alamosa immediately for proper <br />disposal through Thermofluids. <br />If you have any question, contact myself or Edward at your convenience. <br />Sincerely, <br />ASPHALT CONSTRUCTORS, INC. <br />By: <br />Todd A. Stockebrand, President <br />
The URL can be used to link to this page
Your browser does not support the video tag.