Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />This was a complete inspection of the King Coal Mine for the month of March, 2004. The site ~s operating <br />at its normal rate. <br />RECORDS: Records were inspected and found to be in satisfactory condition See page 5 of this report <br />for further details. <br />HYDROLOGIC BALANCE: Both ponds had water in them but were not discharging. All culverts and <br />ditches were inspected and found to be clear and able to properly function <br />GENERAL MINE COMPLIANCE: The site has transported all excess coal and is reshaping the reclaimed <br />portion of the permanent waste pile (see photo). <br />EXCESS SPOILS AND DEVELOPMENT WASTE: The waste ptle ~s stable and all water is diverted offthe <br />top, however some slope grading is regwred to conform to waste p0e designs <br />