Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permiltee/ Permit Field Visit <br />Person CYPRUS EMPIRE CORP. Number C-044-81 Date 07/20/2000 Continuation Page <br />28. Performance Standard Categories <br />Codes: 1=Compliance, 2=Noncompliance, 3=Not Planned, 4=Not Started, S=Noncompliance Ideo[ified ewhere, 6=Previously Cited <br />1. _ Mining within Valid Permit <br />2. _ Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. _ Liability Insurance <br />5. _ Ownership and Convol <br />6..1 Temporary Cessation <br />7. _ AML Rec. Fees -- Non-Respondent <br />8. _ AML Rec. Fees -- Failure to Pay <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2._ Inspections & Certifications <br />3. 1 Siltation Structures <br />4.1 Discharge Structures <br />5.~ Diversions <br />6. 1 EfFluentLimits <br />7. 1 Cround Water Monitoring <br />8. 1 Surface Water Monitoring <br />9.~ Drainage -- Acid-Toxic Materials <br />10.1 Impoundments <br />l l._ Stream Buffer Zones <br />C. Topsoil & Subsoil <br />l._ Removal <br />2. Substitute Materials <br />3._ Storage and Protection <br />D. <br />General <br />Performance <br />Category <br />Backfilling & Grading <br />I._ Exposed Openings <br />2._ Contemporaneous Reclamation <br />3._ Approximate Original Contour <br />4._ Highwall Elimination <br />5._ Sleep Slopes (includes downslope) <br />6._ Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1._ Placement <br />2._ Drainage Control <br />3._ Surface Stabilization <br />4._ Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />I._ Drainage Control <br />2._ Surface Stabilization <br />3._ Placement <br />4._ Inspections and Certifications <br />5._ Impounding Swclures <br /> <br />E. <br />F. <br />G. <br />Use Of ExploCvesf ~ 6 I) bbeciai cocoa on xc <br />l._ Blaster erb tcauon <br />2. Distance Prohibitions <br />3._ Blast Survey/Schedule - <br />4._ Warnings & Records <br />5. Control of Adverse Effects - <br />H. _Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3. 1 Drainage <br />4. 1 Surfacing and Maintenance <br />5._ Reclamation <br />J• Signs & Markers <br />I._ Signs <br />2._ Mazkers <br />K. _Distance Prohibitions <br />L. Revegetation <br />l._ Vegetative Cover <br />2._ Timing <br />M. _Postmining Land Use <br />N. Other <br />3) <br /> Performance Standard Categories E. Excess Spoil Disposal ...........................................(816/817.71-74) <br /> 30 CFR Counterpart I. Placement ................................................................ ...........................71(e) <br />A. Administrative ........................................................................ 2. <br />3 Drainage Control.................................................... <br />................... <br />Surface S(abtltralion ............................71(f) <br />............................71(g) <br />1. <br />2. Valid Pemut .................................................... <br />Mining within Bonded Area .................. .................................777.11 <br />..............................773.11 . <br />4. ............................ <br />Inspections & Cenifications................................... ............................71(h) <br />3. Terms & Conditions of Permit ............... ..............................773.17 F. Coal Mioe Waste (Refuse Piles/Impaumdmemts) ,,,,,(816/817.81-84) <br />4. <br />5. Liability Insurance .................................. <br />Ownership and Conuol ........................... ..............................800.60 <br />................... ..778.13 <br />........ <br />1. <br />Drainage Control ................................................... <br />............................83(a) <br />6. Temporary Cessation .............................. 842.1 I (e) & 816/817.131 2. <br />3 Surface Stabilization............................................... <br />. <br />. <br />..... <br />.................................. <br />Placement ........................... <br />...........................83(c) <br />7. AML Rec. Fees --Non-Respondent ....... .........................870.1 S(b) . <br />4. .................. <br />... <br />. <br />. <br />Inspections and Certifications ................................. ..........................83(d) <br />8. AML Rec. Fees -- Failure to Pa <br />y ............ 870.15(a) <br />...................... <br />... 5. Impounding Swctures............................................ ................ . <br /> <br />.............. <br />B. Hydrologic Balance ........................... ...........(816/817.41-57) <br />G. <br />Use of Explosives ..................................................(816817.61-68) <br />1. <br />2. Drainage Control .................................... <br />Inspections&Certifications ................... ....................................45 <br />..........................49(a)(10) <br />I. <br />BlasterCertification................................................ <br />...........................61(c) <br />3. Siltation Stmctures ................................. ...................~..................46 2. Distance Prohibitions.............................................. ...........................61(d) <br />64 <br />62 <br />4. Discharge Swcmres ............................. ......................................47 3. <br />4 Blast Survey/Schedule............................................ <br />Warnings & Records .............................................. - <br />........................... <br />........................66 & 68 <br />5. <br />6. Diversions .............................................. <br />E(Fluent Limits ....................................... .....................................43 <br />.....................................42 . <br />5. Control of Adverse Effects..................................... ................................67 <br />7. Ground Water Monitoring ..................... .................................41(c) H. Subsidence Coutrol Plan.............................. ...........(817.121-122) <br />8 . Surface Water Monitoring ..................... .................................41(e) I. Roads.................................................................(816817.150-151) <br />9 <br />10 . Drainage--Acid-Tonic Materials .......... <br />. Impoundments ....................................... .................................41(f) <br />.....................................49 <br />1. <br />Road Constmction.................................................. <br />.........................I50(c) <br />1 I . Stream Buffer Zones .............................. .....................................57 2. <br />3. Certification............................................................ <br />Drainage .................................................................. .............. ...........I51(a) <br />.............150(b)-ISI(d) <br />C. Topsoil & SubsoB .............................. .................(816817.22) 4. Surfacing and Maintenance.................................... ..............I50(e)-I51(d) <br />I . Removal ................................................. .................................22(a) 5. Reclamation............................................................ ..........................150(0 <br />2. Substitute Materials ................................ .................................22(c) J. Signs & Markers .......................................... .............(816/817.11) <br />3. Storage and Proleclion ........................... ..................................22(c) <br />1. <br />Signs....................................................................... <br />..............II(a).(b),&(c) <br />4. Redistribution ......................................... .................................22(d) 2. Markers ................................................................... ...II(a).(b),(d).(e).&(t) <br />D. Backfilling & Grading ................... ...........(816817.95-107) ~ Distance Prohibitions................................... ....................(761.11) <br />1. Exposed Openings .....................816/817 .13, I4, I5, & 823.1 I & 21 L. Revegetation.....................................................(816/817.111-116) <br />2. <br />3. Contemporaneous Reclamation .............. <br />Approximate Original Contour ............... ....................................100 <br />...........................102(a)(I) <br />I. <br />Vegetative Cover................................................... <br />....................11 I & 116 <br />4. Highwall Elimination ................ <br />............. <br />........................... <br />102(a)(2) 2. Timing.................................................................... ..............................113 <br />5. Sleep Slopes (includes downslope) ......... ...................................107 M. Postmining Land Use..............................................(816/817.133) <br />6. Handling of Acid & Toxic Materials ...... ................................102(c) pa e 2 of <br />7. Stabilization (rills and gullies) ................ ..................................95(b) a~,..,m t>~~, e, i we g <br />