My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC43104
DRMS
>
Back File Migration
>
Inspection
>
INSPEC43104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:34 PM
Creation date
11/18/2007 11:30:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Inspection
Doc Date
2/12/1998
Doc Name
COAL INSPECTION REPORT
Inspection Date
2/10/1998
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Below aro comments on the Inapectlon. Ths comments kxx;tude discwsion of obeervetlona made <br />during the Inspection. Comments also describe any enforcement actlorre taken during the inspection <br />and the facto or eNdencs supporikrg the enforcement action. <br />On February 10, 1998, William J. Garber from the Division of Minerals and Geology, accompanied by <br />Tom Anderson, repressing Oxbow Carbon and Minerals, performed a partial inspoctia~n of the <br />Sanborn Credo Mir. ~8 the inspection, the weather was clear and wld. <br />Just a reminder, be sure and order the new signs indicating the new name, so that they can be installed <br />as soon as possible attar the twenty first of February. <br />• Continue controlling nmoff ti~om construction and directing it to the sedimentation ponds. <br />• Pond A contains free weber just below the primary discharge point. <br />• Pond B c~tains free water below the primary discharge point. Expansion of this pond is <br />currmdy underway. <br />• 'The east yard pond contains very little standing water. <br />• The sediment pond at substation three is dry, except for a small amount of snow. <br />The topsoil pile up Elk Creek now contains all the topsoil from the east yard pile as well as all <br />strippable topsoil from the areas currentty under construction. <br />Contnue to saNaga topsoN as constructlon opens up new ground. <br />Now that the contractor has covered the topsoil slgn on the Elk Creek p8e, R is Important ib <br />irratell a new elgn on thfa topsoil pNe. Please have this aocompUehed before the next <br />Urepection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.