Laserfiche WebLink
Below aro comments on the Inapectlon. Ths comments kxx;tude discwsion of obeervetlona made <br />during the Inspection. Comments also describe any enforcement actlorre taken during the inspection <br />and the facto or eNdencs supporikrg the enforcement action. <br />On February 10, 1998, William J. Garber from the Division of Minerals and Geology, accompanied by <br />Tom Anderson, repressing Oxbow Carbon and Minerals, performed a partial inspoctia~n of the <br />Sanborn Credo Mir. ~8 the inspection, the weather was clear and wld. <br />Just a reminder, be sure and order the new signs indicating the new name, so that they can be installed <br />as soon as possible attar the twenty first of February. <br />• Continue controlling nmoff ti~om construction and directing it to the sedimentation ponds. <br />• Pond A contains free weber just below the primary discharge point. <br />• Pond B c~tains free water below the primary discharge point. Expansion of this pond is <br />currmdy underway. <br />• 'The east yard pond contains very little standing water. <br />• The sediment pond at substation three is dry, except for a small amount of snow. <br />The topsoil pile up Elk Creek now contains all the topsoil from the east yard pile as well as all <br />strippable topsoil from the areas currentty under construction. <br />Contnue to saNaga topsoN as constructlon opens up new ground. <br />Now that the contractor has covered the topsoil slgn on the Elk Creek p8e, R is Important ib <br />irratell a new elgn on thfa topsoil pNe. Please have this aocompUehed before the next <br />Urepection. <br />