ORIGINAL -PUBLIC FILE <br />(Page 2J <br />MINE ID # OR PROSPECTING ID #: ti+-toan_7ee <br />INSPECTION DATE: L/3/n7 INSPECTOROS INITIALS: -9K- <br />OBSERVATIONS <br />The Division conducted a bi-monthly inspection of the site on 1/3/06. Present during the <br />inspection were Tim Comer and Gary Goodrich The area had received a considerable amount <br />of snow the past two weeks. <br />Inspected the Cresson pit Ares. The South and East Cresson's were active, storm water <br />diversion structures in the area were found to be in good repair. Backfilling of the East <br />Cresson pit is continuing. No problem noted. <br />Inspected the old Pad #3 & 4 areas. Spent ore removal in anticipation of the mine <br />extension is continuing. Ponds 6, 7 & 8 are expected to be removed, liner folded and <br />removed and buried in one of the mine back fill areas. Inspected the process plant area <br />and looked at the daily logs being kept by the operators for each shift. The log even <br />though adequate could use some improvements to include additional information about the <br />pad. <br />Inspected the Phase I, II, II&IV Leach pad areas and collected the following readings from <br />the High and Low Volume Solution Collection Transducers. <br />Phase I High Volume Solution Collection Transducer #1 was recorded at 7.0 (read out meter <br />still not functioning) #2 was at 50.1 and # 3 was at 51.4 piezometer for the pond was at <br />56.7 feet. Low Volume solution collection transducer #1 was recorded at .27 and # 2 was at <br />.53. Phase II &222 High Volume solution Collection transducer # 4 was recorded at 24.6 # <br />5 was at 19.6 and # 6 was at 25.7, piezometer for the pond was at 29.1 feet. Low volume <br />transducer # 1 was at. and #2 was at. <br />Phase IV High Volume solution Collection Transducer # 7 was recorded at 29.7, #B was at <br />31.2, #9 was at 34.3 and # 10 was at 32.9. Low Volume transducer # 1 was at 18.4 and # 2 <br />was at 6.3 inches of hydrostatic head. <br />Inspected the External pond, it was holding a small amount of what appeared to be frozen <br />water .Low volume Solution Collection transducer # 1 for the pond was recorded at 12.8 and <br /># 2 was at 11.3 inches of hydro static head. <br />Inspected the under drain area, both the south and 4 inch pipes were discharging. The <br />north under drain and solid 24 inch pipes were dry. All lower ponds were holding about the <br />same amount of what appeared to be frozen water covered with snow as was noted during last <br />months inspection. <br />I & E Contact Address <br />NAME: TIM COMER <br />OPERATOR: CCBV <br />STREET: P n gOx 191 <br />CITY/STATE/ZIP: VICTnR Cnl nRAnCI ROR6n <br />r BL <br />P FS <br />r HW <br />C HMWMD (CH) <br />r <br />P SE <br />r WQCD (CHI <br />r OTHER <br />cc: r CE <br />