Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required abatement and <br />date of abatement for the violation, previous violations still requiring abatement and the termination of <br />violations cited during previous inspections. <br />Two Notices of Violations (NOVs) were issued as a result of this inspection; CV-2003-002 <br />and CV-2003-003. Abatement requirements associated with each NOV are listed below. <br />There are no outstanding abatement items remaining from previous enforcement actions. <br />NOV CV-2003-002 <br />1) Reestablish Ditch HRD-A2-ME-5 through the area described by 5p.m., 4/17/03. <br />This abatement item was fully abated within the specified time frame and <br />documented by DMG on the afternoon of 4/17103. <br />2) Repair embankment erosion, and roughen and seed area of sediment deposition <br />5/1 /03. <br />NOV CV-2003-003 <br />1) Regrade lower D Pit spoils to establish design drainage into natural channel and <br />away from Road G NE Ditch by May 30, 2003. <br />2) Regrade eroded Road G ditches and ditch relief down-drain segments to restore <br />design cross sections. Install, repair or replace riprap as necessary to prevent <br />erosion from the 10 year, 24 hour storm event runoff by May 30, 2003. <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Revised 2/97 <br />