My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42948
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:27 PM
Creation date
11/18/2007 11:29:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Aggregate Industries - WCR Inc.
Inspection Date
5/30/2002
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tom Schreiner <br />May 30, 2002 <br />Page three <br />9. . <br />AGGREGATE <br />INDUSTRIES <br />for outcome of groundwater modeling study to determine <br />reimbursement for pump <br />Case well -contacted AI mid May <br />11. Waiting for outcome of groundwater modeling study to determine <br />reimbursement or payment of new well and pump <br />12. Stated to Mr. Case, that if the situation worsened that AI could provide <br />assistance during the interim period <br />In addition to the above, the Platte Valley Mine ceased dischazge from one dewatering <br />pump, in eazly April, into the South Platte River. As stated in our mitigation efforts, this <br />water is pumped into the ski lake located east of the plant. The second discharge point <br />into the river will cease shortly and water will be pumped water into an old, abandoned, <br />unlined channel of the Mcliannon Ditch. This will allow wafer to rechazge the area north <br />of the mine. If during the course of the water modeling study shows no impact to the <br />azea to the north, water to this area will cease and dischazge to the river may resume. <br />To date, Joe Sasaki, who sent the Division a letter, has not contacted Aggregate <br />Industries about issues with his wells. Aggregate Indastr~es is coacemed that because we <br />aze offering to pay for the deepening of certain wells that many more landowners in the <br />vicinity of the mine will come forward with unwarranted complaints of injury to wells. <br />We recognize the severity of the drought and its impact in the azea and sympathize with <br />the landowners affected by these conditions. At this time, AI feels it is necessary to <br />complete a groundwater modeling study to determine future obligations to adjacent <br />landowners and prevent unwarranted claims against Aggregate Industries. The <br />groundwater study will take approximately 4-6 weeks for completion. <br />We hope this provides the Division with the course of action AI has chosen to take. <br />Please call me at 303-716-5304 if I can provide additional information. Thank you. <br />Sincerely, <br />` ~- <br />Jamie W. Gaboriau <br />Manager of Environmental Affairs <br />attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.