My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42877
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:23 PM
Creation date
11/18/2007 11:28:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981026
IBM Index Class Name
Inspection
Doc Name
CANADIAN MINE C-81-026 1996 INSPECTION SUMMARY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ -- , <br />• • III IIIIIIIIIIIII III <br />Canadian Mine C-81-026 <br />1996 Inspection Summary <br />January-Partial Mine site inaccessible due to snow, drifts and strong winds. Records <br />checked, and aerial photos reviewed. <br />February-Partial Aerial <br />Mazch-Complete Snow covered, no problems observed on site. Encountered consultant on <br />site conductir-g Pond inspections <br />May-Partial Aerial <br />May-Complete On site meeting with consultant, Jerry Koblitz, Liability release of Load-out <br />was discussed. Bullet hole on Pond 2 riser-to be repaired. Minor tilling on W <br />inslope of pond 2. Rill formation on S and W banks of Pond 1. Operator has <br />identified in Rill and Cully survey and has scheduled repairs. Grazing plan for 1996 <br />was discussed. some snowdrifts remain. <br />June-Partial First yeaz of Phase III bond release vegetation data was being collected during <br />this inspection. Rills at Pond 1 have been repaired. <br />June-Partial Cattle on site as per grazing plan. <br />Phase II Bond Release for the Canadian Mine was approved on December 21, 1995. On <br />February 6, 1996 Division received concurrence from OSM. 30-day period for public <br />comment ended February 3, 1996. No objections were received. Decision was final <br />February 7, 1996. <br />As per Rules 5.02.2(2), and 5.02.2(4)(b), once Phase II release has been approved, only one <br />complete inspection per quarter is required on an inactive site. <br />August-Complete Weed spraying for control of Canada Thistle had occurred. Trampling <br />by cattle at North end of Pond 1 occurred during grazing. Rill/gully repairs at S and <br />W sides of Pond 1 have been broadcast seeded. Golden eagle on site. <br />October-Complete <br />
The URL can be used to link to this page
Your browser does not support the video tag.