My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - M1974070 (6)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1974070
>
_INSPECTION - M1974070 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 1:18:57 PM
Creation date
11/18/2007 11:27:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974070
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DMG
To
Lafarge West Inc.
Inspection Date
12/9/2002
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br /> PROJECT IDENTIFICATION <br /> Task# : 001 State:Colorado Permit/job#:M-1974-070 <br /> Date : 1212012002 County:Weld Abbreviation :none <br /> User: TAS Site:Nelson Filename :M070-001 <br /> Agency or organization name :Division Of Minerals& Geology <br /> Permit or other job action :Final Reclamation <br /> Task description :Excavate or Backfill & Grade 41 Acre-feet of overburden/soil to finish <br /> HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R-8SU Horsepower: 305 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2:NA <br /> Data source : (CRG) <br /> Utilization% <br /> Cost Breakdown• Ownership cost/hour: $42.20 NA <br /> Operating cost/hour: $61.31 100 <br /> Ripper op. cost/hour: $a00 NA <br /> Operator cost/hour: $30.65 NA <br /> Total unit cost/hour: $134.16 Total fleet cost/hour: $268.33 <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume : 66,147 CCY factor: 1.115 volume: 73,754 LCY <br /> Source of estimated volume :permit <br /> Source of estimated swell factor:program <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br /> Average push distance : 150 feet Material consistency : 1.10 (Cat HB) <br /> Unadjusted hourly production : 634.3 LCY/hr Dozing method: 1.20 (s-by-s) <br /> Visibility: 1.00 (avg.) <br /> Material consistency description : Job efficiency: 0.83 (lshift/day) <br /> Partly consolidated stockpile Spoil pile : 0.60 (fnd-sf) <br /> Push gradient: 1.02 (Cat HB) <br /> Average push gradient: 1.00 %(neg) Altitude : - 1.00 -"(Cat HB) <br /> Average site altitude: 6,000 feet Material weight: 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br /> Material weight: 2,100 Ibs/LCY Net correction : 0.55 <br /> Weight description <br /> Earth-Loam Adjusted unit production : 350.17 LCY/hr <br /> Adjusted fleet production : 700.34 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) Total job time: 105.31 Hours <br /> Unit cost: $0.383 /LCY Total job cost: $28,258 <br />
The URL can be used to link to this page
Your browser does not support the video tag.