Laserfiche WebLink
<br />Hdoov.~s oo~mov mme inpeaum 'Ibe oammeus mdoee Sian of abravrtiom mesa ~g,ne m~peaico. <br />Ca®ad~ deo derm'be my aotmeeme~ clime dtom during the inepaaim and ab sde a avia®oe supporting mo <br />mr~om~,aaQ <br />'I~is was a partial inspection of the Southfield Mine based on aerial photographs of the site taken <br />December 16,1997. The site is active, and currently producing coal. <br />Refuse was being placed on the ~zfuve pile. It did not appear that any g~inB or ~P~B ~ <br />refuse had been completed reoentiy, as tl~ce were a member of dump piles over the active lift area <br />Poadv 1, 2, 3, and 4 held water. Ponds 3 and 4 were covered with ice. Pond 5 was not <br />phobog<aphed. Most of the site ditches were snow covered, so it was not apparent whether a~ <br />were flowing. <br />C•~I.OIQ <br />~~I~~Iq~ <br />