Laserfiche WebLink
<br />CIRCES III IIIIIIIIIIIII III rare • <br />COa t aui.rr.9,99. . <br />Date : Q~~C~t~O~ <br />User : WHE <br />Site : Cadgene Pit <br />State :Colorado <br />County :Montrose <br />M158-000 <br />DIVISI011 of Minerals and Geology Filename :_ <br />Agency or organization name : DMG <br />Permit or job action :General 110c bond review <br />Permit or job no. <br />Abbreviation <br />M-1983-158 <br />none <br /> <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Highwall reduction from 1 H:1 V to 3H:1 V dozer 1 4.46 $535 <br /> <br />002 -Rip and rough grade 9 acres at 1' depth dozer 1 31.66 $3, 838 <br /> <br />003 -Redistribute topsoil 4.5" depth over 9 acres scraper2 1 10.6 $2, 068 <br /> <br />004 -Revegetate 9 acres affected area revege 1 9.0 $6, 616 <br /> <br />005 -Haul reclamation equipment to and from job site mobilize 3 3.4 $765 <br /> <br />006 -Misc. debris, assume 10'L 'S'W • 5'H @ $0.22/c/ NA 1 4.0 $55 <br /> <br /> <br /> <br /> C 1 <br /> <br /> <br /> -/ 3- /5 <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 63.2 $13,877 <br />• includes innalion laclor adjustment of: NA % TOTAL DIRECT COST'=I $13,677 <br />I 1.~,'AY,~, :, .,~~~ ~$ :7 <br />r. <br />xY r "" `?tom. -_ ~ .a . :,..... Jd: ~ ~4 ~fili ns'X"^ ~-( <br />x <br />x.:' it z. _3"c,e t 2 ,.~,°] b~.N "f„~fnRW <br />-. <br />.. <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - LIablllty InSUranCe : 1.55 % of direct total = $215 <br /> Performance bond : 1.05 % of direct total = $146 <br /> Job superintendent : NA• NA NA total = NA <br /> Proft : 10.00 % 01 direct total = $1,388 <br />-not required (or eqp. operator serves as super) TOTAL 0 8 P = $1, 749 <br />CONTRACT AMOUNT (direct + O B P) _ $1$, 626 <br />PROJECT MANAGEMENT- <br />Engineering work and/or conr.racUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $781 <br />CONTINGENCY- NA• NA total = NA <br />contingencies accounted for at task lev~xl <br />TOTAL INDIRECT COST= $2,530 <br />TOTAL BOND AMOUNT (direct+ indirect) _ $16,407 <br />xy.. ~ <br />