My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC42493
DRMS
>
Back File Migration
>
Inspection
>
INSPEC42493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:46:04 PM
Creation date
11/18/2007 11:26:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995056
IBM Index Class Name
Inspection
Doc Date
3/2/2000
Doc Name
MINERALS PROGRAM INSPECTION REPORT
Inspection Date
2/4/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION CO~SUMMARY cont'd sFeet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I_______~__________________________________________I__________ <br />NA ~ Not indicated in reclamation plan <br />Subtotal (K): <br />____________ <br />L. DRILL HOLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (S) <br />NA ~ Not indicated in reclamation plan <br />Subtotal (L ): <br />M. MISCE LLANEWS RECLAMATION TASKS <br />Task No.~ <br />________I <br />___________ Task Description <br />______________________________________ ~ Cost (E) <br />_I___________ <br />9 ~ Demolition assume 10'L • 10'Y • 5'H is 5.22/cf ~ 5110 <br />7 ~ Seeding per attached task 7 worksheet ~ 515,092 <br /> Fencing <br />8 ~ Mob/Demob per attached task 8 worksheet ~ E1, 140 <br />Subtotal (M): 516,342 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 539,867 <br />11. 1ND IRECT COSTS <br />______________ ___ ____ ___ ___ __ __ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (S) <br />_.___.__I________________________~________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 5618 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 5618 <br />3. ~ Contractor's Profit........... 10.OOY. of dir. ~ 53,981 <br />4. ~ Job Superintendent..equip op serves as super <br />Subtotal (A): 55,223 <br />------------ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 545,090 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description ~ Cast (S) <br />7. ~ Minerals Program Admin. Fee at S.OOX of cntr.~ 52,254 <br />NET INDIRECT COST PERCENTAGE: 16.76% Subtotal (B): 52,254 <br /> <br />TOTAL INDIRECT RECLAMATION ______ ___ _ <br />COSTS (subtotals A through B): ___________ <br />57,477 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 547,344 <br />
The URL can be used to link to this page
Your browser does not support the video tag.