Laserfiche WebLink
~ ~ ~t 1 of 4 <br />~l orado Division of Minerals and Geology <br />RECLAMATION COST SUMMARY FORM <br />PERMIT NUMBER M-95-056 PREP. BY: WHE FILENAME: M056-0 L.);;;;~~,4J1.7~ ~ F~'IC <br />~i.'i'` <br />DATE *" ee#f~~ OPERATION: Weber Pit No. 2 i ~ ~ ,.. :..r• f";,,_r, <br />;: <br />~,~''~8 OC ------------------------------- -.. <br />PERMIT ACTION General 172c bond review ~ ~~,5 ~ CS~ - <br />GRAND TOTAL BOND AMOUNT 547, 344 <br />I. DIRECT COSTS =__=________ <br />________________________________________________________ _______________ <br />________________________________________________________________________ <br />A. EARTHWORK - BACKFILLING 8 ROUGH GRADING <br />Task No.~ __-___- Task Description ~ Cost"(E)-_ A <br />________I__________ ____________________________I_ /~~ <br />2 ~ Rip 8 grade pit floor 8 stockpile area, 20 acre <br />E);~hsba ~9,p ~ ~/(~~ <br />O~jo/ i~1 Q <br />~~~~ O~d <br />~C <br />~~9 <br />Y <br />Subtotal (A ): 572,768 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task No.~ Task Description <br />1 ~ Highwall reduction from O.SH:1V to 3H:1V slope <br />52,095 <br />Subtotal (B): 52,095 <br />C. EARTHWDRK - WASTE PILE COVER PLACEMENT <br />Task No.~ Task Description <br />________l__________..________________________ <br />NA ~ Not indicated in reclamation plan <br />Lost (5) <br />Cost (S) <br />Subtotal (C ): <br />