Laserfiche WebLink
• (Page 2) • <br />MINE ID # OR PROSPECTING ID # M-94-117 <br />INSPECTION DATF~ 11-16-98 INSPECTOR'S INITIALS CHM <br />OBSERVATIONS <br />This was a monitoring inspection conducted during liner installation at the mill. The <br />operator, through Colorado Lining Inc. was attempting to line the lower part of the <br />constructed tailings pond. A recent snowstorm has left water in the bottom of the pond. <br />There was standing water in the north and south ends of the pond. The operator was told that <br />lining directly over standing water was not acceptable and water was actively pumped from the <br />areas of standing water most of the day. <br />Rocks :in the subgrade were removed. Sandy material was placed where rocks could not be <br />removed. Where water had been standing, sandy material was added to improve foundation <br />stability. <br />The in:;pector left the site from 1100 to 1400 to inspect another site in the area. <br />Upon return to the site, solutions to improve foundational stability were discussed. It was <br />decided to use scrap 60 mil High Density Polyethylene (HDPE) to cover wet foundation areas <br />to spread the load and add a water barrier so wet foundation would not affect the Geotextile <br />Clay Liner (GCL) material. This was done in the northern part of the bottom of the pond. <br />Only two runs of GCL and HDPE were installed this day since most work was concentrated on <br />founda'~:ion preparation and drying. <br />I & E Contact Address <br />NAME Ms. Maxine Stewart <br />OPERATOR ITEC Environmental. Inc. <br />STREE7.' 9605 West 49`~ Rvenue, #102 <br />CITY/'.STATE/ZIP Wheat Ridoe, CO 80033 <br />cc: Mr. Christina <br />CE <br />BL <br />FS <br />HW <br />HMWMD (CH) <br />SE <br />WQCD (CH) <br />OTHER <br />Kamnikar, DMG <br />