Laserfiche WebLink
.1 sheet 1 cE 4 <br />- [o to ra do Division of Minerals and Ceo loq/ <br />RECLAMATION COST SUM14MR'f FORM <br />' PERMIT NUMBER M-BO-IBJ PREP. BY: TAS FILENAME: M1B]-0 <br />GATE 27-Jan-9B OPERATION: Brannan Pic k29 <br />PERMIT ACTION EinaL 0.eclamacion <br />GRAND TOTAL BOND AMOUNT 5411,410 <br />2. DIRECC [OSTS •••_•_-•••__ <br />A. EARTHWORK - BACKFILLING fi ROUGN GRADING <br />task No.~ Task Oescn pcion ~ Cost (9f <br />1 ~ Regrade 1,700 L.F. Parcel A NE shoreline co J:1 ~ 51. J71 <br />2 ~ Reg tade fi,100 L.F. Patcel A SfiW shoreline co 3:1 ~ 55,682 <br />3 ~ Regrade 1.900 L.E. Parcel B E shoreline co J:1 ~ 51,190 <br />4 ~ Regrade 1,000 L.F. Parcel B N shoreline co l:l ~ 5716 <br />Subco[a1 (A): $8,979 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />Task No.~ Task Description ~ Cost I51 <br />__________________________________________________________I____________ <br />5 ( Regrade 2,000 L.F. Parcel A 40' HW co 3:1 slope ~ 57,924 <br />. 6 ~ Regrade 2,000 L.F. Parcel B 40' HW co 1:1 slope ~ 53,924 <br />Subtotal (B1: $7,P4B <br />C. EARTHWORK - WASTE PILE COVEA PLACEMENT <br />Task No.~ Task Descripc ion ~ Cost (91 <br />~ ~ <br />~ ~ <br />~ ~ <br />_-______I__________________________________________________I"___________ <br />Subtotal (C1: <br />