Laserfiche WebLink
~ • <br />Colorado Division of ninerals and Geology <br />ESTIMATING FORM - BULLD02ER uORR <br />Task q: 10 Prep. by: TAS Task FLle Name : M1B3-10 <br />Dace: 01/26/98 Pe tmit p:M•80-197 Mine: B[a nnan Pic p29 <br />Perini[ Acc ion: Final Reclamation <br />Task Description: Finish grading of 22 acres: convne rc is l/residential <br />HOURLY EQUIPMENT COST <br />', ................. .... Basic Machine: Cat DBN Horsepower: 2B6 <br /> Blade Type: UNIVERSAL ~~--"-"-' <br /> Attachment pl: RO PS Cab Bhi EC Basis: 1/day <br /> Attachment p2: N/A <br />__________ <br />Cost Breakdown: <br />"""""""'""""" Uc ilizecion M <br />Ownership <osclhr 576.59 N/A <br />Operating a overhau l cos[/hr- dozer - 552.51 100 <br /> -ripper 50.00 N/A <br />Operator cost(ht - 522.95 N/A <br />Total etc, unit cost/hi - 5112.05 total <br />________ fleet [osc/h r : 6224.10 <br />________ <br />', MATERIAL QUANTITIES <br />IRlCldl $we11 L009e <br />Volume: 35,79].0 LCY Factor: N/A Volume: 35.797.0 LCY <br />Source of quantity c ake-oEf: permit <br />Source of est. swell factor: program <br />_________ <br />___________________ <br />_____________ <br />___________ <br />HOURLY PRODUCTION <br />••••-...•••••--•~ Jab Condition Correction Factors <br />Avg. push distance: 700 fc. "" ""'""""°" " "" "°"' <br /> """--~'"" Operator.......... 0.75 ]avg.) <br />Unad7usced hourly Mac. consistency.. 1.20 ICac 1611 <br />dozer production: 74q LCY/hr Dozing method..... 1.20 (s-by-sl <br /> "'""° " Visibility........ 1.00 iavg.) <br />Hatetial consistency : Job efficiency.... 0.97 Ilsh./day) <br />Loose stockpile Spoil pile Eactar. 0.60 (fnd -sf1 <br />'""""""""'"""""" """""""'""'"" Push gsadienC. .... 1.02 ]Cat tb11 <br />~. ~ Avg. push gradient: 1.00 R (negl Altitude derat ion. 1.00 (Cat cbl) <br /> """--'~"" Material weight... 0.96 (Cat cbll <br />Avg. lice altitude: 6000 ft. Blade type........ 1.00 (B or U1 <br />Ma cerial weigh[ 2400.00 lb/LCY Net Job Correction 0.53 <br />MdC. De9C[.: _________ ___________ <br />Sand - Dry, loose <br />____________________ <br />_________________ Adj us ced Uni[ Prod. : 191.45 <br />___________ LCY/::: <br /> Adj us [ed Flee[ Production : 762.90 LCY(hr <br />JOB COST "'""""' <br />Flee[ size 2 Dozer (sl <br />________ Total Job Time: 97.57 <br />___________ Hours <br />Unit Cos[ 50.619 /LCY Total Job Cost : 521,956.44 <br />