Laserfiche WebLink
_ Coiora do Division of Minerals and Geology <br />ESTIMATING FDRM - BULLDOZER rORA <br />Taak p: 5 Prep. Ey: TAE Task File Name: M1B3-9 <br />Dace: 01/26/98 Pe rmic p:M-90-1B3 Mine: Brannan Pic q~9 <br />Permit Action: Final Rec la macion - parcel A <br />Task Description: Regrade 2,000 L.E. of 40' highra ll; 1:1 to J.1 slope <br />_____________________________________________________________ <br />HOURLY EQUIPMENT LOST <br />..................... Basic Machine: Cac DBN Xo rseporer: 265 <br /> Blade Type: VN IVER$AL """-"-""" <br /> Attachment el: BOPS Cab Shi EC Basis: 1/day <br /> Attachment k2: N/A """--"""" <br />Cost Breakdorn: <br />""""""""""""" UC it izac ion k <br />Orne rs hip cost/hr 9Je.69 N/A <br />Operac [ng 6 overhaul cost/hr- dozer - 552.51 100 <br /> -ripper 50.00 N/A <br />Operator cosc(hr 522.95 N7A <br />Total egpt. unit cost/hr 5112.05 Total fleet cost/hr: 5224.10 <br />MATERIAL QUANTITIES <br />. <br />........ <br />........ <br />.. <br />Initial <br />Sue 11 <br />Loose <br />Volume: 29,639.0 <br />____________ CCY Factor: 1.060 Volume: <br />__________ _ 31.406 <br />_________ .7 <br />___ LCY <br />Source of quanc icy c ake-off: permit <br />Source of est. swell factor: program <br />HOURLY PRODUCTION <br />• ................ Job Cond is ion Correct ion Facco cs <br />Avg. push distance: 60 Ec. """""'"""""""'""' """"""' "" <br /> _________ Operator:... ...... 0. 75 (avq.) <br />Unadjusted hourly Mat. consistency.. 0. 90 (Cat tb11 <br />dozer production: 1787 LCY/hr Dozing method..... 1. 20 (s-by-s) <br /> """ "' Vis ib>11ty........ 1. 00 (avq.l <br />Material consistency : Job efflcsency.... O. B7 Iish/dayl <br />Compacted fill or embankment Spoil pile factor. 0. 90 feed-fcl <br />""""""""""~""""'"'"" """""""' """"""" Push gradient..... 1. 11 (Cac cbll <br />Avg. push gradient: 5.00 i (negl Altitude derac ion. 1. 00 (Cac cb11 <br /> '''''''"" Material reighc... 0. 96 (Cat tbl) <br />Avg. site alt icude: 6000 <br />_________ ft. B1a de type........ <br />_____________________ 1. <br />_________ 00 <br />__ (S or V) <br />Material re ighc 2400.00 Lb/LCY Nec Sob Correction 0. 65 <br />Mac. Desc r.: _________ _________ __ <br />Sand - Dry, loose Adj u9 Ced UniC Prod.: 895. 76 LCY/hr <br /> Adjus ted Fleet Production: 1797. 51 LCY/hr <br />JOB COST """""" "" <br />Fleet size 2 <br />________ Dozerlsl Total Sob Time: 17. <br />_________ 51 <br />__ Hours <br />Unit Cosc 90.125 <br />________ /LCY Toca1 Job C09C: 57,921. <br />_________ 32 <br />__ <br />