Laserfiche WebLink
<br />(Page 2) <br /> <br />MINE ID # OR PROSPECTING ID # M-83-176 <br />I.NSPEA'T ION DATE August 30, 1999 INSPECTOR'S INITIALS TAS <br />OBSERVATIONS <br />1. A site inspection was made of the Speer Development site, approximately 5 miles southwest <br />of Brighton, Colorado along old Brighton Road. The site is directly north of 120th Avenue <br />and Old Brighton Road. Mr. George Speer was present during the inspection. <br />2. The purpose of the inspection was to follow up on corrective actions requested by the <br />Division on page 3 of the previous inspection report dated March 24, 1998. Because of the <br />site's long inactivity and lack of notice for temporary cessation, the Division had requested <br />that the operator either 1) resume active mining within 30 days, or 2) begin final <br />reclamation of the existing disturbance within 30 days and complete all required reclamation <br />tasks by October 31, 1998. <br />3. The August 30, 1999 inspection revealed that the operator has elected to resume active <br />mining. The existing disturbance was approximately 1.5 acres and included several large <br />product stockpiles. Mr. Speer indicated that he has plans to begin full scale mining at <br />the site within the next 6 months, with mining to be done by a contract mining company. I <br />mentioned that he also has the option to transfer the permit to another operator (who may <br />perform the mining &/or reclamation). <br />I & E Contact Address <br /> ^ CE <br />NAME George Speer ^ BL <br />OPERATOR Speer Development ^ FS <br />STREET 12021 Brighton Road ^ HW <br />CITY/STATE/ZIP Henderson, CO 80640 ^ HMWMD (CH) <br /> ^ SE <br /> ^ WQCD (CH) <br />