Laserfiche WebLink
After seeding the topsoil stockpile, a weed free straw matting that will encourage vegetation growth and <br />provide stabilization will be used. Photographic documentation will be submitted upon completion of the <br />topsoil stabilization, prior to the September 28, 2007 Corrective Action date. The change to the seed <br />mixture will be reflected in a future technical revision to the mining permit. Please don't hesitate to <br />contact me at 970-878-6800 if you would like to discuss this matter further. <br />Sincerely, <br />essica Dooling~r /L <br />Environmental Specialist <br />XTO Energy Inc. <br />Cc: Terry Matthews, Sr. Production Superintendent <br />Chuck Freier, Area Production Superintendent <br />Lisa Winn, Environmental Manager <br />