Laserfiche WebLink
<br />III. Comments -Compliance <br />Below are comments on the inspection. The comments include discussion of <br />observations made during the inspection. Comments also describe any <br />enforcement actions taken during the inspection and the facts or evidence <br />supporting the enforcement action. <br />Un JnlyL3, lyy2 Lhe llt~ision conducted a partisl inspection oi' the 'l error Creek <br />Loadout. nt the time of the inspection Kelly 1•ritzler was present representing the <br />'Terror Creek Company. The weather was clear and warm. <br />'the sediment control system for the loadout was inspected. This apl.eared Lo tre <br />in good working order. The ditch on the north side of the coal processing area <br />contained some sediment but this ditch is oversized and serves as a seutment <br />trap for the pond. <br />do concerns were noted <br />