Laserfiche WebLink
• (Page 4) <br />MINE ]:D # OR PROSPECTING ID # ~ M-94-117 <br />INSPECTION DATE 8-21-97 INSPECTOR'S ZNITIALS GC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />PB1. A tear was observed in the liner on the uphill side of <br />the tailings pond. <br />Corrective Action: Repair the torn liner by 9-15-97. <br />PB2. The bulkhead in the Hazel `A' adit is leaking. <br />Corrective Action: Repair the leak by 9-15-97. <br />PB3. There is scrap PVC in the diversion ditch southeast of <br />the tailings pond. <br />Corrective Action: Clean out the diversion and properly <br />dispose or store the material no later than 9-15-97. <br />CORRECTION <br />DATE <br />9-15-97 <br />PB or PV PB <br />TOPIC(S) PW <br />9-15-97 <br />PB or PV PB <br />TOPIC(S) PW <br />9-15-97 <br />PB or PV PB <br />TOPIC(S) MP <br />