Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />The damage occurred in the immediate vicinity of a drainage pipe that has been installed on the <br />hillside. Material has flowed downhill from the location of the drainage pipe, and a small <br />amount of fine material has been deposited on the ground surface east of the former shop <br />building. Water was dischazging from the pipe onto the lower portion of the slope. The flow of <br />surface material appears to have been caused by saturated ground conditions. Please maintain <br />this area to ensure the stability of the reclaimed slope. <br />