Laserfiche WebLink
Colowyo C-1981-019 <br />3 October 2005 ~J <br />Pg2/2 <br />After we visited the initial box-cut area we drove through the proposed disturbance <br />area. Due to the rain and very muddy, slippery road conditions, it was difficult to see <br />much more of the site at that time. We ended up our tour on the west side of the <br />proposed disturbance boundary in the Collom Creek drainage. Colowyo is not <br />proposing any pits in the Collom creek drainage. <br />This concluded our very wet and abbreviated visit to the site. On 4 October 2005 a <br />second field trip was scheduled to visit areas that were being studied as possible <br />AVF's. I was unable to attend this trip but Sandy Brown and Dan Mathews of CDMG <br />did attend. Their comments are included in the aforementioned letter to Tay Tonoai. <br />I will probably conduct additional field visits to the site, as weather permits. These <br />trips (if they occur) will be documented in future inspection reports. <br />