Laserfiche WebLink
<br />,F U. S. DEPT. OF THE INTERIOR <br />T OFFICE OF SURFACE MIl~E~ <br />~o <br />III'll'll'I I MI St teePEv~aaal~a pion MAR 2 9 2000 <br />F~ f)ivisinn of Minerah R Aanlr <br />__ 9ss - -__-_-______._. <br />1. Permittee/Person 9. Permit Number 10. Permit T}'pe <br /> TWIN PINES #2 C-83-058 PP <br /> 2. Address 11. Field Visit Date 12. Purpose 13. SRA Present <br /> BOND FORFEITURE SITE 02/07/2000 O~ <br />3. City 4. Slate `"`""~ -`~ <br />^ 14. Permit Status 15. Site Status 16. Facility e <br /> FR B <br />5. Zi Code 6. Phone Number <br /> <br />( 17. OSM Office # 18. CCID # 19. Land Code <br /> 140 <br />7. erator Name, if Different lhan <br />Perntittee N <br /> ame <br />20. M.S.H.A ID # 21. State Abrev. 22. Cotmty <br /> REVOKED - DMG ADMINISTERED <br />CO FREMONT <br /> <br />8. Mine Name <br /> 23 . AVS Permittee Entity ID Number 24. State 06-ice <br />TWUV PINES #2 <br />25. Hours 26. y~,h a ck 27. <br />eviewio Official: <br />0.5 a. Pernut Review (~ i <br />r~ <br /> Si 1a e: Signature: <br />0 b. Site Visit Time <br />1 <br />. MITCH R INGS ID # 370 <br />° <br />0 c. Travel Time <br />4 <br />P <br />i <br />d N Review Date: <br />i' / LY/ uu <br />. ame: <br />r <br />nte mm - dd - yyyy <br />l,p d. Report Writing Date: 03/08/2000 Is Supplemental MSE Page Used Y/N Y^ <br />PermR Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Rem 12 CCR....Citizen Complaint Referral (non site visit) <br />per.„.Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) <br />ppermitted but not yet disturted. AB7.. Bond Forfeiture: Bond (oAeiture officially in process or completed, and. <br />IN....Inaclive (Permanent Progam Permit): Phase II completed or reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permll) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 76 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pendingg The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke fhe permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporsry Cessation: The RA has granted performance bond(s), and/or reclama- <br />FR 8161 li <br />f f <br />rt <br />it <br />d <br />it <br />i <br />i <br />i <br />n progress. <br />on o <br />o <br />e <br />e <br />s <br />e <br />s <br />have started and where coal mining operations cessation of min <br />ng pursuant l0 30 C <br />have not begun. 817.137 (b). FR.. Forfeited and Reclaimed: Forfeiture <br />I b <br />d <br />l <br />l <br />ti <br />l <br />t <br />d <br />R <br />Ph <br />ase <br />on <br />re <br />ease rec <br />ama <br />on comp <br />e <br />e <br />. <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I <br />elease: At least <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN.. Alive Non-Producing: Active non-producing permits, partial bond release. is Permitted but there is no band. <br />(aciliryry such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcal: Coal mining and reclamation <br />d <br />i <br />d <br />ti <br />h <br />t <br />k <br />l <br />M <br />ace an <br />ning: The Permit Status is active, sde is for the entire perm <br />tte <br />area. opera <br />ons <br />ave or are <br />a <br />ing p <br />NM..No <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining active ,and site not regraded. the RA has released all bond. re wired ermits from the RA. <br />Facility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H... Exploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />8... Underground F... Loading Facility antl/or Tipple J... Exempt 16 and 213 <br />C .. Preparation Plant G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a enc 's <br />responsiveness to small business. II you are a small business (a business with 500 or fewer employees including those of affiliates) page 1 of <br />and wish to corrunent on the enforcement or compliance activities of OSM, call 1-888-REG-FAII2 (1-888-734-3247). a.~a na~eQ a, i9~s <br />