My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC41535
DRMS
>
Back File Migration
>
Inspection
>
INSPEC41535
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:45:24 PM
Creation date
11/18/2007 11:21:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
OSM Inspection Report
From
OSM
To
DMG
Inspection Date
10/25/2004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation State Program <br />Permittee/ COLOWYO COAL CO. Permit C-019-81 Field Visit 10/27/2004 Continuation Page <br />Person Number Date <br />28. <br />,3=Not <br />~B. <br />IC. <br />1. 1 Mining within Valid Permit <br />2. 1 Mining within Bonded Area <br />3. ~ Terms & Conditions of Permit <br />4. 1 Liability Insurance <br />5. 1 Ownership and Control <br />6. 1 Temporary Cessation <br />7. 1 AML Rec. Fees -Non-Respondent <br />8. 1 AML Rec. Fees -- Failure to Pay <br />Hydrologic Balance <br />1. 1 Drainage Control <br />2. 1 Inspections & Certifications <br />3. ~ Siltation Suuctures <br />4.~ Discharge Suuctures <br />5.~ Diversions <br />6. 1 Eft]uentLimits <br />7. 1 Ground Water Monitoring <br />8.~ Surface Water Monitoring <br />9. 3 Drainage -- Acid-Toxic Materials <br />10.1 Impoundments <br />11.1 Sueam Buffer Zones <br />Topsoil & Subsoil <br />1. 1 Removal <br />2. 1 Substitute Materials <br />3. 1 Storage and Protection <br />Planned, 4=Not Started, S=Noncompliance Identified Elsewhere, 6=Previously Cited <br />D. Backtilling & Grading g, 3 Subsidence Control Plan <br />1. 1 Exposed Openings I. Roads <br />2. 1 Contemporaneous Reclamation 1. 1 Road Construction <br />3. 1 Approximate Original Contour 2. 1 Certification <br />4. 1 Highwall Elimination 3. 1 Drainage <br />5. 1 Steep Slopes (includes downslope) 4. 1 Surfacing and Maintenance <br />6. 1 Handling of Acid & Toxic Materials 5. 1 Reclamation <br />7. 1 Stabilization (rills and gullies) J, Signs & Markers <br />E. Excess Spoil Disposal I: 1 Signs <br />1. ~ Placement 2. 1 Markers <br />2.~ Drainage Conuol K. 1 Distance Prohibitions <br />3.~ Surface Stabilization L. Revegetation <br />4.~ Inspections & Certifications 1 <br />Vegetative Cover <br />1. <br />F. Coal Mine Waste _ <br />2_ 1 Timing <br />(Refuse Piles/Impoundments) <br />3 M. 1 Postmining Land Use <br />Drainage Control <br />1. <br />2. 3 Surface Stabilization N. Other <br />3. 3 Placement General <br />4. 3 Inspections and Certifications Petforman ee <br />5. 3 Impounding Structures Catagory <br />G. Use Of Explosives I) <br />1. 1 Blaster Certification _ <br />2. 1 Distance Prohibitions 2) <br />3. 1 Blast Survey/Schedule _ <br />4. 1 Warnings & Records 3) <br />5. 1 Control of Adverse Effects _ <br />~ A. <br />I{B. <br /> Performance Standard Catagories <br /> 30 CFR Counterpart <br /> Adminis[rative ................................. ........................................ <br />1. Valid PemtiL...._ ..........................................:. ..................................773.11 <br />2. Mining within Bonded Area .................. ..............................773.11 <br />3 . Terms & Conditions of Permit ............... ..............................773.]7 <br />4. Liability Insurance ................................. ...............................800.60 <br />5 . Ownership and Control .......................... ..............................778.]3 <br />6. Temporary Cessation .............................. 842.] 1(e) & 816/817.131 <br />7. AML Rec. Fecs -- Non-Respondant....... ..._ ....................870.15(6) <br />8. AML Rec. Fees -- Failure to Pay ............ .........................870.15(a) <br /> Hydrologic Balance ........................... ...........(8161817.41-57) <br /> <br />1. Drainage Control ............................................ .............................45 <br />2. Inspections &Certifications ........................... ..................49(a)(10) <br />3. Siltation Strucmres ......................................... .............................46 <br />4. DischazgeStructures......_....._ ....................... .....................__....47 <br />5. Diversions ...................................................... .............................43 <br />6. Effluent Limits ................................................ ............................42 <br />7. Ground Water Monitoring .............................. ........................41(c) <br />8. Surface Water Monitoring .............................. _......................41(e) <br />9. Drainage--Acid-ToxicMaterials ................... ........................4](f) <br />10. Impoundments....... _ ....................................... ............................49 <br />] 1. Stream Buffer Zones ...................................... .............................57 <br />II C. <br />D. <br /> <br />Topsoil &Subsoil ...............................................(816/817.22) <br />1 . Removal ............................................................ ......................22(a) <br />2. Substitute Materials .......................................... .......................22(c) <br />3. Storage and Protection ...................................... .......................22(e) <br />4. Redistribution ................._................................. ......................22(d) <br /> Backfilling & Grading ............................. .(8161817.95-107) <br />1. Exposed Openings .....................816/817.13, 14 , 15, & 823.11 & 21 <br />2. Contemporaneous Reclamation ......................... .........................100 <br />3. Approximate Original Contour .......................... ................102(a)(1) <br />. Highwall Elimination ......................................... ................102(a)(2) <br />. Steep Slopes (includes downslope)...._ .............. ........................107 <br />. Handling of Acid & Toxic Materials .................. ....................102(c) <br />. Stabilization (rills and gullies) ............................ 4 <br />5 <br />6 <br />......................95(6) <br />7 <br />E. Excess Spoil Disposal ...........................................(816!817.71-74) <br />1. Placement ...................................................:........... ............................71(e) <br />2. Drainage Control ..............................._.................. .............................71Cf) <br />3. Surfaces[abthzation.._ .......................................... .............................71(g) <br />4. Inspections &Certifications ................................... ............................71(h) <br />F. Coal Mine Waste (Refuse Pilcs/Impoundments) ,,,,,(g16/817.81-84) <br />I. Drainage Controt ................................................... ............................83(z) <br />2. Surface Stabi]ization......_ ............._....................... ....._.....................83(6) <br />3. Placement ......................................................_....... ............_........,.....83(c) <br />4. Inspections and Certifications ................................ ...........................83 (d) <br />5. Impounding Structures..._ ...................................... ................................84 <br />G. Use of Explosives ........................................... .......(816/817.61-68) <br />1. Blaster Certification ......................_..............-......... ................_..._....61(c) <br />2. Distance Prohibitions .............................................. ...........................61(d) <br />3. Blast Survey/Schedule .............._............................ ...........................62-64 <br />4. Warnings & Records .............................................. ........................66 & 68 <br />5. Control of Adverse Effects ..................................... ................................67 <br />H. Subsidence Control Plan .............................. ...........(817.121-122) <br />I. Roads .............................................................. ...(816/817.150-131)] <br />]. Road Conswction ................... ...........~............................................150(c) <br />2. Certification ............................. .........................................................151(a) <br />3. Drainage._......._ ....................... ......................_.............._....150(6)-151(d) <br />4. Surfacing and Maintenance ...... ............................................150(e)-]5](d) <br />5. Reclama[ion ............................. .........................................................150(f7 <br />J. Signs & Markers .............. .........................................(816/817.11) <br />1. Signs ................_...................... ......_..............._....................1](a).(b),&(c) <br />2. Markers .................................... ..................................1](a),N),(dL(e),&(B <br />K. Distance Prohibitions ....... ................................................(761.11) <br />L. Revegetation ...................... ...............................(816(817.111-116) <br />I. Vegetative Cover ..................... ..................................................111 & 116 <br />2. Timing....---- ............................. ................._........_.........._............_.....i 13 <br />M. Postmining Land Use ........ ......................................(816/817.133) <br /> a.~;.Pa~...m~..a ~~4s Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.