Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />be submitted soon. <br />West Pyeatt No. 1 had been recently cleaned. The operator was in <br />the process of cleaning up the terrace that had been built for the <br />drag bucket equipment. East Pyeatt No. 2 had also been cleaned out <br />recently. <br />SLIIMP AREA <br />At the slump area, readings were taken of the depth to water in the <br />two monitoring wells. At the south well, the depth to water, from <br />the top of the casing, was 13.4 feet. The depth to water, from the <br />top of the casing, was 8.9 feet at the north well. The seep down <br />gradient of the southern monitoring well was still wet. The trees <br />that the operator had planted within the seep area were continuing <br />to grow. There was a very slow trickle coming out of the french <br />drain at the base of the slump area. There was a pronounced change <br />in vegetation between the east and west halves of the slump area. <br />The east half has a lot more grass, while the west side has only a <br />little grass and a moderate amount of Russian thistle. Contour <br />ditches were functional at the slump area. The operator has <br />submitted a report on the monitoring of the slump area, with a <br />request that monitoring be terminated. <br />2 <br />