Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No company <br />representative was present during the inspection. The Eastside Mine is in reclamation only status. <br />The inspection involved viewing three aerial photographs taken by Harry Ranney of DMG on June 10, <br />1997. <br />Hydrologic Balance The sediment pond was dry and embankments were well vegetated. The <br />temporary drainage channel appeared to be in good repair. The permanent channel was well <br />vegetated and did not show any signs of erosion. No major erosion features were noted on the <br />reclaimed slopes. <br />Backfilling 8 Grading The backfilled and graded area showed no signs of instability. The portal and <br />fan area appeared stable. <br />Reveoetation Vegetation on the mine site looked relatively good for the second growing season. <br />Numerous shrubs could be depicted around the pond and lower portions of the undisturbed mine site. <br />