Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the Eastside Mine conducted by Erica Crosby of DMG. No company <br />representative was present during the inspection. The Eastside Mine is in reclamation only status. <br />The inspection involved viewing one aerial photograph taken by Harry Ranney of DMG on May 9, <br />1997. <br />Hydrologic Balance The sediment pond appeared to be dry and embankments were well vegetated. <br />No major erosion features were noted on the reclaimed slopes. The permanent and temporary <br />drainage channels appear to be in good repair. <br />Backfilling R Grading The backfilled and graded area showed no signs of instability or erosion. The <br />portal areas appeared stable. <br />Revegetation Vegetation was noted on the backfilled and graded slopes. Some bare spots were <br />noted on the northern end of the reclamation just east and west of the permanent diversion channel. <br />This is the second growing season for vegetation at the Eastside Mine. <br />