My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC41285
DRMS
>
Back File Migration
>
Inspection
>
INSPEC41285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:45:14 PM
Creation date
11/18/2007 11:20:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Inspection
Doc Date
7/19/2007
Doc Name
Inspection Report
From
DRMS
To
CC & V
Inspection Date
7/16/2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL -PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: nn_taRn-yea <br />INSPECTION DATE: - -7/16,L47 INSPECTOROS INITIALS: ~KK- <br />OBSERVATIONS <br />The Division conducted a third quarter water sampling inspection of the under drains on <br />7j16j07.Presnt during the inspection was, Mark Vanoni of CC&V. The area had received <br />measurable precipitation the night before, which was evident at the time of the <br />inspection. <br />Inspected the recently completed Phase IVC liner barrier, the 4 inche solution <br />distribution pipe was in place .Mark stated that the 10 inche solution collection pipes <br />will be connected with in the next few days and the exposed liner covered with 2 feet <br />drain cover material as approved in Amendment # 8 and TR 48. <br />Inspected the Phase I, II, III & IV valley leach facility and recorded the following <br />readings from the High and Low Volume Solution Collection Transducers. <br />Phase I High Volume Solution Collection Transducer #1 was recorded at 7.0 #2 was at 47.2 <br />#3 was 48.3 Piezometer for the pond was at52.3 feet. Low Volume transducer # 1 was at .32 <br />& #2 was at .54. <br />Phase II & III High Volume solution collection transducer # 4 was recorded at 38.3 * 5 was <br />at 39.2 and # 6 was at 40.5. Piezometer for the pond was recorded at 42.5 feet. <br />Phase IV High Volume SOlutlOn CO11eCtlOn transducer # 7 was recorded at 45.4 # 8 was at <br />46.2 #9 was at 46.9 and # 10 was at 46.9. Low volume transducer # 1 was recorded at 11.4 <br />and # 2 was 9.4 inches of hydrostatic head. <br />An auxiliary pump was noted pumping solution from the Phase IV, low volume sumps on to the <br />pad, this solution even though at present is only approximately 6ppm wad cyanide <br />concentration, some ponding of this solution, a very small amount was noted along the west <br />side of the Low Volume Solution readout out meters. Mark vanoni contacted Denny Deemer, <br />the pad manger and Mr. Demmer stated that in order not to exceed the maximum allowable 2 <br />feet head on the double lined system over the weekend, the temporary pump was placed which <br />caused the small ponded area. He stated that CC&V is working on a permanent solution so <br />they will not have to place additional pumps to pump the low volume solution, each time <br />the pregnant solution storage is running high. <br />This small area receives surface water drainage from the load out bin area which causes <br />siltation and hence prevents percolation. CC&V had attempted to rectify the surface water <br />drainage problems but until the load out bin is moved to the new location and ore is <br />loaded on Phase IVC, adding low volume solution in addition to the surface water drainage <br />only exasperates the problem. <br />Inspected the External pond, it was holding some water, Low volume solution transducer # 1 <br />was recorded at 11.4 and # 2 was at 9.4 inches of hydrostatic head. <br />Inspected the under drains all the lower ponds were dry. The dissipation (surface water <br />diversion sumps were holding some water from the recent rains. <br />Both the South and 4 inches pipes were discharging, a split sample was collected for wad <br />cyanide analysis and delivered to the CDOH&E lab the same day. <br />I & E Contact Address <br />NAME: TIM COMER <br />OPERATOR: CC&V cc: r CE <br />STREET: P C)_B(~X 791 <br />r BL <br />CITY/STATE/ZIP: vicrne ~~i ~RAn~ ant3~n r FS <br />r HW <br />r HMWMD (CH) <br />r <br />r SE <br />
The URL can be used to link to this page
Your browser does not support the video tag.