Laserfiche WebLink
RELATIVE C011PACTIOPI TEST RESULTS <br />PROJECT: West Elk Coal Mine PROJECT N0: M92009MT DATE : 3/31/92 <br />LOCATION: Somerset, Co ENGINEE RING TECH NICIAN: Hayes <br />CLIENT: West Elk Coal Mine <br /> DEPTH PROCTOR OPTIMUM DRY IOISTURE RELATIVE <br />TEST LOCATION OR DENSITY HUISTURE <br />CONTENT DE"151TY CONTENT <br />COMPACTION <br />SOIL TYPE <br />N0. ELEVATION PCF ~ PCF ~ 9 <br />5 On gob pile. 200' north of pipe 6240 72.5 17.5 75.3 12.3 100 coal gob, black <br /> 45' from east side of pile <br />6 On gob pile. 300' north o£ pipe 5240 72.5 17,5 72,7 13.6 100 coal gob, black <br /> 50' from east side o£ pile <br />7 On gob pile. 100' north of pipe 6240 72.5 17,5 68,1 15.6 94 coal gob, black <br /> 25' from east side o£ pile <br />8 On gob pile. 200' north of pipe 6240 72.5 17.5 70,7 14.2 98 coal gob, black <br /> 90' from east side o£ pile <br />REMARKS; The test results indicate the density and moisture content fo r the location and <br />elevation tested only. <br />RELATIVE COMPACTIONI TEST RESULTS <br /> ~ ' <br />~t1lll~lCt'~ ~111a OC1~1t <br />~,~~ C,~ <br />