Laserfiche WebLink
c <br />III. COMMENTS -COMPLIANCE /~ ~ -ld / '~3~ <br />~~ \~( ~~Sel~ ~~ ~ <br />Below are comments on the inspection. The comments include discussion of observations <br />made during the inspection. Comments also describe any enforcement actions taken during <br />the inspection and the facts or evidence supporting the enforcement action. <br />This was a partial inspection of the GEC mine conducted by Jim Stark of CDMG. The <br />bond for this site has been forteited and reclamation was completed by DMG. The <br />weather was warm and sunny and the ground was dry. <br />The East Pit area appeared to be in good shape. The riprap that was placed in the <br />top of the drainage and the large gully below the haul road appears to be stable. <br />(According to AI Weaver at the neighboring Southfield Mine the area received <br />about 1 inch of rain over the past weekend.) The road along the upper West Side of <br />the East Pit has some ruts but is in overall good shape, <br />The Orphan Pit, Duck Pond and Tipple areas were also well vegetated and in good <br />condition. The road to these areas is the Corley Mountain Ranch road. It is very well <br />maintained and in excellent shape. <br />