My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC41084
DRMS
>
Back File Migration
>
Inspection
>
INSPEC41084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:45:04 PM
Creation date
11/18/2007 11:19:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Inspection
Doc Name
Inspection Report
Inspection Date
7/19/2006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made during <br />the inspection. Comments also describe any enforcement actions taken during the inspection and the <br />facts or evidence supporting the enforcement action. <br />ROADS <br />Some roadside ditches have down cut below design depths (see the inspection report of June 6, 2006). <br />No remedial work has been accomplished. <br />HYDROLOGIC BALANCE <br />There were no overland surface flows. There was water in checkdams 7 and below of the string-of <br />peazls. Discharges from the sedimentation ponds were mostly from seep and spring discharges. <br />Discharge from the West Ridge pond was estimated at 1 gallon per 6 seconds (0.02 cfs). Discharge <br />from the Center Ridge pond was estimated at 1 gallon in 3 seconds (0.04 cfs). The flume flow <br />measurement was 0.15 foot (0.52 cfs). Dischazge from the Moffat Pond was measured at 1 cup/8 <br />seconds (0.001 cfs). <br />BACKFILL AND GRADING <br />A small amount of grading is currently required at the facilities area adjacent to Oak Creek to complete <br />the requirements of the reclamation plan. There has been no activity on this reclamation. <br />SUPPORT FACILITIES <br />An office building and associated parking area in the Oak Creek facilities area still remains on site. <br />There was no sign of change in condition. <br />TOPSOIL <br />A small storage pile of topsoil is retained for the remaining reclamation of the of the facilities area in <br />the vicinity of Oak Creek. <br />FISH AND WILDLIFE <br />A head of elk was observed during this inspection. <br />REVEGETATION <br />Revegetated areas looked good. There did not appear to be any erosional features. <br />SLIDES AND DAMAGE <br />C-1980-007 CP Inspection July 79, 2006 page 3 of 5 pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.