Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID 0` M-88-090 <br />INSPECTION DATE 11/20/95 INSPECTOR'S INITIALS CLR <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />TWIC Enterprises has mined and stored topsoil outside Jan. 26, 1995 <br />the permit area. An amendment or conversion may be PB or PV PV <br />required to correct the possible violation of the TOPIC(S) TS. OD <br />permit ,Q..o PH- a,,,~ 3 u • 3 a - s - 1 (h C1) ~, . <br />The Operator ie storing concrete onsite; for this Jan. 26, 1995 <br />practice to continue, a technical revision to the PB or PV PB <br />permit ie required, including the maximum amount of TOPIC(S) ES <br />material to be stored at any one time, how the material <br />will be removed or reclaimed, and a map showing where <br />it will be stored. <br />The financial warranty posted may be inadequate for the <br />amount of disturbance at the site. DMG will recalculate PB or PV PB <br />the bond within 60 days of this inspection, at which TOPIC(S) FN <br />time the Operator may either poet more bond or complete <br />more reclamation work if the amount of financial <br />warranty increases at that time. <br />