Laserfiche WebLink
~.~ ~ ~ i <br />INSPECTION REPORT - PAGE 2 <br />FILE N0. m-77-302 <br />DATE: January 29, 1986 <br /> <br />OBSERVATIONS OF IMPORTANCE: <br />1,) Inspectors met with Mr. Bob Olson of Colorado Lien at the mine site. <br />2.) Mining and backfill operations are proceeding as specified in the permit <br />and recent amendment. <br />3.) It was discussed that reclamation will commence in the area roughly <br />adjacent to and north of the main access/haul road into the quarry. A <br />test plot will be established in that area when a sufficient area is <br />available. <br />4.) Some material is being spilled over the downslope edge of the mine, <br />particularly near the crusher area. Additionally, gully erosion is <br />occurring at locations along this outslope area. <br />RECOMMENDATIONS: <br />1.) Please repair the rock berms along the east edge of your lowermost <br />working bench such that runoff and sediment do not carry offsite. <br />Erosion and downslope spillage should be mitigated if the berms are <br />properly maintained. <br />Doc. No. 7374E <br />