Laserfiche WebLink
<br />MIi~vE I~ n G:: PROSPEC'iIIvG Ian: _i-1999 -iii12 _.-_~~. q <br />Ii?SPECTION DATE: 5-22-00 INSPECTOR'S INITIALS: ACS <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the first page of this report should be notified <br />of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />PROBLEM PB-1: Inadequate perimeter storm water controls 7/20/00 <br />around the temporary lay down and parking <br />area. Inadequate embedding of hay bale <br />controls. PB or PV PB <br />CORRECTIVE ACTION: Implement storm water recommendations TOPIC(S) SP <br />contained in the observations section <br />of this report. The Division will <br />conduct a follow up inspection during <br />summer 2000. <br />