~9-Gu:. <br />INSPECTION DATE: 5-22-00 <br />OBSERVATIONS <br /> <br />PACE: 2 <br />INSPECTOR'S INITIALS: ACS <br />A monitoring inspection of the Yankee Gulch Sodium Minerals Project was conducted. <br />The Piceance Site upgrade facilities and the pipeline to the Parachute Plant are <br />currently under construction. American Soda is also in the process of developing <br />34 production well pads and intends to drill 26 initial production wells as soon as <br />the Underground Injection Control permit is secured and the amount of reclamation <br />bond is adjusted to cover the cost of plugging and abandonment of production wells. <br />The main Piceance Site access road, well field access road, roads to individual well <br />pads, and well field piping were also under construction at the time of this <br />inspection. <br />The temporary lay down area approved through technical revision TR-002 was inspected. <br />The following three pertinent observations were recorded: <br />• The fuel storage tanks in the lay down area are surrounded by earthen berms and <br />the basin formed under the tanks is lined with a high density polyethylene liner. <br />The Division recommends that the liner be anchored into the berm such that no free <br />edges are exposed. This will prevent wind from catching and damaging the liner. <br />• The storm water controls at the perimeter of the lay down area consisted of low <br />earthen berms and silt fence. A substantial percentage of the silt fence was down <br />and ineffective. The earthen berms were observed to be effective at concentrating <br />runoff and routing it along the berm's interior. However, it was observed that <br />the berms were frequently breached at the location of natural drainage ways <br />allowing the release of untreated storm water outside the disturbed area <br />footprint. The Division recommends that the silt fence be eliminated in this area <br />of application, and that the berms be inspected and repaired so that storm water <br />is contained in the disturbed area and allowed to evaporate or soak into the <br />ground. In locations where storm water must be released, the storm water <br />treatment facilities described in the approved "Soil Conservation, Erosion and <br />Sediment Control, Reclamation, and Revegetation Plan" must be installed. American <br />Soda personnel and contractors are referred to Appendices A through E of the <br />approved plan for details on the proper installation and maintenance of storm <br />water controls. These treatment facilities may include rock check dams, straw or <br />hay bale check dams, gabion baskets, sediment traps, and vegetative filters. Where <br />silt fence is to be used, it must be keyed into the ground and must be inspected <br />and maintained, particularly after rain and wind events. See problem PB-1 on the <br />final page of this report. <br />• One area where it was observed that water was exiting the perimeter of the lay <br />down area, a saline crust had formed in the drainage way. American Soda was <br />directed to investigate and report on the source of this discharge and to take <br />measures to prevent a reoccurrence. It has subsequently been determined that a <br />water wagon had been parked for several nights at the location in question, and <br />water from the tank had leaked through the valve. Since this water was derived <br />from water supply well 20-8 at the Test Mine Facility it contains approximately <br />2500 ppm bicarbonate, which explains the mineral crust. <br />The Piceance Facility storm water pond was inspected. The spillway is located in <br />the southwest corner of the pond and is constructed to direct overtopping flow into <br />a lined and riprapped plunge pool. Pond inlets are two 24 inch corrugated plastic <br />pipes located in the northeast corner of the pond. The pond is securely fenced. The <br />Operator is storing a small amount of water in the pond, but is maintaining <br />sufficient freeboard to fully contain a 100-year storm runoff. Based on this <br />