Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the <br />inspection and the facts or evidence supporting the enforcement action. <br />This was a complete inspection of the Carbon Junction Mine for the month of Februrary,1998. <br />Availability of Records: The records were inspected and found to be satisfactory. Further details <br />of the inspection can be found on. page 5 of this report. <br />Hydrologic Balance: All ditches and ponds were inspected and found to be in compliance, both <br />ponds were covered in fresh snow but appeared stable and capable of functioning as designed. <br />All culverts were clear and capable of functioning as designed. <br />Excess Spoil and Development Waste :The revision changing the final configuration to the <br />overburden pile has been approved and construction of the approved design change was being <br />implemented. <br />