Laserfiche WebLink
the slump had been regazded to 3 horizontal to 1 vertical, and topsoil was being stripped from areas of <br />the underground drains. <br />TOPSOIL <br />A small storage pile of topsoil is retained for the remaining reclamation of the of the facilities area in <br />the vicinity of Oak Creek. <br />As mentioned above, topsoil was being stripped from disturbed areas of the West Ridge Pond repair. <br />SLIDES AND DAMAGE <br />See the West Ridge Pond discussion under Support Facilities. Damage to the pond was under repair. <br />As reported above, there is down-cutting of a roadside ditch along a section of road permanent road <br />above the "Chain-of-Peazls" crossing. No repair work had been accomplished to date. <br />RECLAMATION SUCCESS <br />Reclamation accomplished to date appeared to be successful. <br />C-1980-001 CP Inspection 13 November 2006 page 4 of 5 pages <br />