My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSPEC40446
DRMS
>
Back File Migration
>
Inspection
>
INSPEC40446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 9:44:39 PM
Creation date
11/18/2007 11:16:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979166
IBM Index Class Name
Inspection
Doc Date
12/20/2002
Doc Name
Response to Inspection
From
Elam Construction Inc
To
DMG
Inspection Date
12/20/2000
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~/~ 1 r.~rt~l <br />CONSTRUCTION, INC. <br />1225 South 7th Street <br />Grand Junction, Colorado 81501-7791 <br />(970) 242-5370 FAX (970) 245-7716 <br />December 16, 2002 <br />~~~~~~~® <br />Mr. Steve S. Shuey / DEC 2 3 2002 <br />Colorado Division of Minerals and Geology <br />Grand Junction Field Office Division at Minerals and GeoloGY <br />lol s. 3rd st. suite 301 DEC ? p 28p2 <br />Grand Junction, Co 81501 Grand Junction Fleld ©f/!ce <br />D;'vision of Minnr?el4 & C9eotogy <br />File: M-1979-166 <br />Project: Bennet Gravel Pit <br />Location: Delta County, Colorado <br />RE: 12-20-2000 Inspection ~ t 5~0 o~lt ~ <br />While some of the issues concerning this pit have been addressed we think it best to <br />reiterate the corrective actions: <br />1. An application for a technical revision dated January 2001 eliminated <br />reclamation phasing and a reclamation bond for the entire gravel pit was <br />submitted. <br />2. Elam Construction, Inc. has implemented a weed control plan for all mine sites <br />they have permitted. <br />3. Topsoil stockpiles have not been seeded at this date. Operations are on-going in <br />the winter of 2003 and will address this issue. <br />4. The dike between the Gunnison River and the gravel pit will be built higher and <br />strengthened during the next mining operation. Tentatively this will occur during <br />the spring of 2004. <br />Sincerely Yours, <br />~-~._ <br />Norman Lincoln <br />Project Manager <br />~.~~ <br />.~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.