Laserfiche WebLink
(Page'S) • <br />u <br />MINE ID # OR PROSPECTING ID # M-90-057 <br />INSPECTION DATE 11/16/00 INSPECTOR'S INITIALS ESC <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLH VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />DATE <br />1. The permit makes note of an exit shaft, but the maps do not _ <br />include the location of the Hunter shaft. The shaft disturbance PB or PV:PB <br />appears to fall within the 1.9 acres of disturbance stated for TOPIC(S):MP <br />'the mine area, but not within the permit boundaries. January 19, 2000 <br />CORRECTIVE ACTION: <br />The operator will need to clarify the permit to include the <br />affected area of the Hunter. The permit text and maps must be <br />submitted to the Division by January 19, 2000. <br />2. Permit boundary markers could not be located at the mill site as - <br />required by Rule 3.1.12. PB or PV:PB <br />TOPIC(S):SM <br />January 19, 2000 <br />CORRECTIVE ACTION: <br />The operator will need to post the boundary markers and submit <br />to the Division photographs that the markers were posted within <br />60 days of this inspection report. <br />3. Temporary ore piles were stored at the mine site and the mill PB or PV:PB <br />site, but were not identified in the application. TOPIC (S):MP <br />January 19, 2000 <br />CORRECTIVE ACTION: <br />The operator will need to identify areas where temporary ore <br />will be stored, and how the area will be lined to prevent the <br />contamination of surface water and groundwater. Location and <br />description of the temporary ore stockpiles must be submitted to <br />the Division in the form of a Technical Revision by January 19, <br />2000. <br />4. On June 5, 1990, the Division approved the Hopemore & Leadville PH or PV:PB <br />Mine with four 4 conditions to the TOPIC(S):ST <br />( ) permit. The Division has not January 19, 2000 <br />received any of the information required by the conditions. <br />CORRECTIVE ACTION: <br />The operator will need to inform the Division the status of each <br />condition noted on the approval letter, and submit all relevant <br />documentation within 30-days of receipt of this report. <br />