Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br />Below are comments on the inspection. The comments include discussion of observations made <br />during the inspection. Comments also describe any enforcement actions taken during the inspection <br />and the facts or evidence supporting the enforcement action. <br />runout areas were stable and in good condition. Recent summer rains had caused minor <br />problems in some of the newly constructed runouts, but the operator was in the process of <br />making necessary repairs. Overall, the road drainage situation on the road is much <br />improved since implementation of the approved plan. <br />General Mine Plan Compliance -The refuse area expansion plan had been implemented, <br />and a layer of refuse cover most of the new expansion area. The lift height of the new <br />areas appeared to be right at 2'. Refuse was being dumped on an upper lift of the pile <br />during the inspection. No grading or compacting was observed. <br />