Laserfiche WebLink
(Page 4) <br />MINE ID # OR PROSPECTING ID #: ~~-1977_4A5 <br />INSPECTION DATE: g/isrns lNSPECTOR~SINITIALS: ~- <br />The following problems (PB) and/or possible violations {PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dotes given to reduce theirseverity when considered <br />by the Mined Land Recamation Board. the inspector noted on the previous page should be notified of all <br />corrective octions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />3. During the inspection it was discovered that the site has not been fully reclaimed and 12 / t y oa <br />during the review of records, it was discovered that the Operator had notified the Division <br />that reclamation of the site commenced in the fall of 1995. This is a problem related to <br />Rule 3.1.3 of fhe Construction Materials Rules and Regulations which states that akl <br />reclamation shall be carried to completion by the Operatorwith oll reasonable diligence, <br />and each phase of reclamation shall be completed within five I51 years from the date The <br />Operator informs the Board or Office that such phase has commenced unless extended by <br />the Board or Oftce. <br />PB or PV: ~B_ <br />TOPIC(S): ~.L <br />Corrective Action: Submit a technical revision to the ~rmit irientifvl~g what m .aa u c will bP ~ - - <br />takon in grnAP tha cite nnrl aatnhli<h nrla~unte ve,9Ptntinn inch irlin~ n time frnmP in which <br />iha rarlmm~iinn of 4ha titr: will hP [~~mF71e}e[f within tiviu IhnT~va of rPr•cipt of Chic rPnnrt <br />