Laserfiche WebLink
,. ~ (Page 3) <br />MINE ID # OR PROSPECTING ID # M-77-493 <br />INSPECTION DATE 8/11/95 INSPECTOR'S INITIALS ACS <br />be pulled back up the slope to reduce it from -1.6:1 to 3:1 or lees. Tailing that is <br />deposited between the East Tailing Delivery Line outslope and Highway 91 will be removed to <br />Robinson Tailing Pond and the removal area revegetated. The areas surrounding the tailing <br />removal include wetlands, which must be avoided and preserved to the extent possible. <br />Buffehrs Lake will be pumped down this fall in order to facilitate clean up and reclamation <br />around the lake. The exact nature of the project will depend on an assessment of site <br />conditions once the lake is pumped down. Debris and tailing will be removed, useful material <br />will be consolidated into a bone yard, and the areas surrounding the lake will be <br />revegetated, including tree plantings transplanted from the topsoil pile east of Mayflower. <br />The lake will then refill. <br />All areas inspected and projects discussed during this inspection are found to be in <br />accordance with the approved permit and reclamation plan. The projects proposed for this <br />fall represent a continuation of the operator's diligent efforts toward fulfilling, and in <br />some cases exceeding, their reclamation obligations at Climax. <br />I ~ E Contact Address <br />NAME Brvice Romig <br />OPERATOR Climax Molybdenum Co. <br />STREET Climax Mine, Highway 91 <br />CITY/STATE/ZIP Climax. CO 80429 <br />cc: Carl Mount, DMG <br />^ CE <br />^ BL <br />^ FS <br />^ HW <br />^ HMWMD (CH) <br />^ SE <br />^ WQCD (CH) <br />^ OTHER <br />