Laserfiche WebLink
• ~ (Page 3) <br />' MINE ZD # OR PROSPECT~''riirNG ID # FI~41-~6~ <br />INSPECTION DATE_ ~O'IWQQ <br />CORRECTION <br />DATE <br />4/1/00 <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective <br />actions) were identified during this inspection. The problems should be corrected by the <br />dates given, or they will become possible violations. The possible violations should be <br />corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1) The mining operations at the pit have extended across the <br />western (?) permit boundary and approximately ;f acres of <br />mining related disturbance exists outside that boundary. <br />The operator may either reclaim the area disturbed outside <br />of the permit area in a manner consistent with the approved <br />reclamation plan or include the disturbed area within a permit <br />area proposed in conjunction with a conversion application <br />for the site. <br />2) The topsoil stockpiles are generally iregular in shape and <br />in need of stabilization. <br />INSPECTOR'S INITIALS <br />~~~ <br />PB or PV: PB <br />TOPIC: OD,MP nyVI1 <br />~~ <br />CORRECTION <br />DATE <br />6/1/00 i <br />PB or PV: PB I~ 1' <br />The topsoil stockpiles should be stabilized as required by TOPIC: TS <br />Rule 3.1.9 (1). If to be stabilized by vegetation, the stock- <br />piles should be shaped for that purpose. <br />~~ <br />1 <br />~~ ~ ~~~ <br />`~~`,~~ <br />~~,' <br />