Laserfiche WebLink
<br />(Page 3) <br /> <br />NDNE m N OR PHOSPECTBV6 D) N Y8S0.19 <br />DiSPECTION DATB 08~15~95 INSPECTOR'3 INITIAIS SSS <br />The roDowlug problems (PB) mdlor paeslble vlalatloue (PV) (aud euggeated correctlve actloue) were IdeatlOed durlag thls luepectlca. The problems <br />should be corrected by the dates ~vea, ar tdey will become poaelble violatloae. The poaelble vlolatloua should be corrected by the datee glveu to <br />reduce their eeverlty wheu cousldered by the IlRued iaad Reclamatlou Board. The laspector noted oo the prevloue page should be uotltled oI all <br />correctlve actloue takes. <br />AND <br />COBBECTP76 ACTIONS <br />CORRECTION <br />DATE <br />1. The access road craealue oI Plcavuae Creek la not tuuctloaal ae desleued la the a0oroved oermlt 09130195 <br />PB or PV PB <br />coRRECTIVE Acrlax Topic(s) Rn <br />Reoalr the washed out DII over the culvert croeelae aI Plcavuae Creek and armor the headwall ®, _, _ <br />or the reoalred DII to areveut Nture wash outs. <br />2. 1 I <br />PB or PV _ <br />TOPIC(S) _ <br />3. I I <br />PB or PV _ <br />ToPlgs) _ <br />