Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />- . ;-OFFICE OF SURFACE MINING <br />;.~~ <br />t~y~ ~ 5 ~~ine Site Evaluation <br />,_.nd~e~-tote Program <br />1.Permittee/Person ~4visionottvAtnr 9. PetmitNumber 10. Permit Type <br /> AMERICAN SHIELD COAL CO. C-015-81 PP <br /> 2. Address 11. Field Visit Date 12. Purpose li. SItA Present <br /> 10830 N- CENTRAL EXPRESSW 03/24/Z0U5 <br />~. City 4. State mm-dd -yyyy <br /> <br />TX 14. Permit Starirs 15. Site Status 16. Facility Type <br />DALLAS AB FR <br />5. Zip Code 6. Phone Number <br /> 17. OSM Office # 18. CCID # 19. Land Code <br />75231 (214)692-7872 <br />140 <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID n 21. State Abrev. 22. County Name <br /> MESA <br />8 <br />Mi <br />N US-03I7U CO <br />. <br />ne <br />ame <br /> 23. AVS Pennittee Entity ID Number 24. State Office <br />FRUITA 1 & 2 <br /> 125973 <br />25. Hours J <br />26. J ~ atm-e oc <br />t 27. Re dewing OfSciaw <br />0.5 a. Permit Review <br />~;' r~~.t,: <br /> Sign tore: , <br />Signature; <br /> 2 <br />5 b. Site Visit Time <br /> , MITCH RO D # 370 <br /> ' <br />`~ <br />a Travel Time <br />0 Review Date: 03 /z ~ <br />/ <br />~ <br />10. Printed Name: <br />mm - dd - yyyy <br />1.0 d. Report Waiting Date: 03/29/2005 Is Supplemental MSE Page UscdY/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />Oxx,...Oversight RFx.... Reclamation Feos CC...... Citizen Complaint (initial site visit) <br />Azx... Assistance - FXx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defned in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(gj <br />permitted but not yet disturbed. A81..Bond Forfeiture: Bond forteiture offcially in process or completed, and. <br />IN....Inachve (Permanent Program Permit): Phase II completed or reclamation In progress or not yet commenced. <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Panially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory A63.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA... Not Applicable: When site is unpermitted. <br />Site Status Codes -Item t5 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC_Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX_Coal Exploration: Coal exploration operations TC_Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />ve started and where coal minin <br />o <br />erations cessation <br />f mi <br />n <br />rsua <br />t to 30 CFR 8161 L <br />n <br />f fort <br />h <br />it <br />d <br />it <br />i <br />i <br />p <br />g <br />g pu <br />a <br />o <br />ni <br />n <br />o <br />o <br />e <br />e <br />e <br />n progress. <br />s <br />s <br />have not begun 817.131(b). FR,. Forfeited and Reclaimed: Forfeiture <br />AP.. Active Coal Producing: Coal surface mining P1...Phase I RRelease: Ai least Phase I bond release reclamation completed. <br />activities are occurrrng. granted for entire permitted area. For interim FO,. Abandoned Site: Abandoned site that <br />AN.. Active Non-Producing. Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or preparation plant. P2., Phase II Release: At least Phase II bond release WC. Wildcat: Coal mining and reclamation <br />NM..No Mining: The Permit Status is active, site (s for the entire permitted area. operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3., Phase III Release: Reclamation completed and the activity is not covered by the <br />mining activity, and site not regraded. the RA has released al! bond. required permits from the RA. <br />Facility Type Codes -Item 16 D._Ancillary (Haulread, Conveyor, and/or Rails) H._Exploration Permits L._ Remining site permitted <br />A._ Surface E... Refuse and/or Impoundment L.. Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loadingg Facility antllor Tipple J... Exempt 16 and 2l3 <br />C.., Preparation Plant G...Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (S$REFA) <br />Your Comments Are Important <br />"I'he Smal] Business and 9gricu]hire Resulatory Enforcement Ombudsman and 10 Regiona) Fav-aess Boards mere established to receive comments fron <br />small businesses about Federal a~eney enforecment actions. The Ombudsman will annually evaluato the enforcement activities and rate each aoeoev's <br />tresponsiveness to small business. [f you are a small business (a business with 500 or fewer employees including those of affiliates) Paae 1 of <br />mtd wish to comment on the enforcement or compliance activities of OSM, call 1-88&)3EC-FAIR (1-$RR-734-3?47). x~ <,tuaomno~a, isss <br />